Skip to content
Undergrounding at a Randwick home
Level 2 electrical

Overhead to Underground Conversion Eastern Suburbs

The wire across your facade or garden replaced with cable in conduit, for cleaner frontages and fewer storm problems.

Get a free quote

Takes a minute. We'll call you back, usually the same day.

No obligation. Your details stay with us and are never sold or shared.

Overhead service lines strung across terrace fronts, Federation gardens and steep harbour blocks are a familiar sight in the Eastern Suburbs. They’re also a common source of trouble: branches from figs and Norfolk pines bring them down in storms, salt corrodes their fittings, and renovations run into them. An overhead to underground conversion replaces the line with cable in conduit from the street pole to your meter board.

Why owners go underground

Heritage frontages. In Paddington and Woollahra, removing the wire and bracket restores the facade.

Storms. Coastal winds and big trees bring lines down. Underground cable is out of harm’s way.

Salt air. Fewer exposed fittings means less corrosion to maintain.

Renovations. A live line across the front stops builders adding the balcony or upper floor they’ve designed.

Steep blocks. Lines strung down harbour slopes in Vaucluse and Rose Bay are hard to maintain.

On an overhead street

We fit conduit up the street pole, trench or bore to the property, and run the cable to the meter board. Ausgrid connects at the pole and the old line comes down.

Sandstone

Much of the east is built on sandstone. Trenches meet rock, old walls and steps. We plan routes around sandstone features and use careful cutting or boring where needed.

Terraces

With little or no front setback, routes run along boundaries or under front steps. We look at every option, including whether rear-lane access is easier.

Harbour blocks

On steep blocks with private poles, going underground can remove those poles altogether. See private power pole replacement if you’d rather keep the line overhead.

The application

Undergrounding needs an Ausgrid application. We lodge and manage it.

With new mains

If the mains are old, replace them at the same time with a consumer mains upgrade.

Planning for later

Size the conduit for three phase now if an all-electric renovation or EV charger is likely.

Your garden afterwards

We backfill and reinstate as agreed, and remove the old line, bracket and raiser.

Parking and neighbours

We plan parking on tight streets and talk to neighbours where routes are close to shared boundaries.

How long it takes

Trenching usually takes a day or two, longer on rock. The cut-over is a short outage.

Where we work

Undergrounding jobs come from across the east, including heritage streets in level 2 electrician Woollahra and harbour blocks in Vaucluse.

Rear lanes

A lot of Paddington and Woollahra terraces back onto lanes. Where a pole or pit is in the lane, running the supply in from the rear can be shorter, cheaper and easier than tunnelling under a front step. We check both options.

Existing pits

On some Eastern Suburbs streets Ausgrid already has underground cable and pits in the footpath. Connecting a home to an existing pit avoids the pole entirely. Your application tells us which connection point Ausgrid will accept.

What to ask your landscaper

If a new garden, driveway or pool is planned, tell your landscaper and builder about the conduit route. Agreeing on it early means it can go in before paving and planting, rather than being dug back up later.

Pool and driveway works

Building a pool, a new driveway or a garage under or near the existing line is one of the most common triggers for undergrounding in the east. Clearances over a pool are strict, and a concrete truck or crane can’t work safely under a live wire. Planning the underground run as part of those works saves digging twice.

Get a price

Book a site visit with the level 2 electrician Eastern Suburbs team for a fixed written price.

Updated

Cost depends on distance, what the route crosses (sandstone, paving, garden), whether we bore, and Ausgrid's requirements at the pole. We give a fixed price after a site look.

What good overhead to underground conversion looks like

Close-up of overhead to underground conversion on a home in the Eastern Suburbs area
What overhead to underground conversion looks like up close on a typical Eastern Suburbs area home.
Signs that overhead to underground conversion needs attention
Typical signs that it needs attention.

Overhead to Underground Conversion in the Eastern Suburbs: step by step

  1. Plan the routePole to meter board around sandstone, trees and services.
  2. Ausgrid applicationLodged and managed to approval.
  3. InstallConduit and cable laid; pits where needed.
  4. Cut overNew supply live, old line and fittings removed, certified.

Overhead to Underground Conversion questions in the Eastern Suburbs

Something else on your mind? Call 02 9158 9936 and ask.

Our terrace has a tiny front garden. Can we go underground?

Often, yes. We plan a short, neat route from the pole to the meter.

We have sandstone walls and steps. Is that a problem?

We route around sandstone where possible and cut or bore carefully where we can't.

Does going underground reduce storm damage?

Yes. An underground service can't be brought down by a branch.

Need a Level 2 electrician in the Eastern Suburbs?

📞 Call now Free quote