The supply isolated at the Ausgrid side for builders, roofers and scaffolders, then reconnected and certified.
Turning off your main switch leaves the service line, bracket and mains live. Anyone working near them, from scaffolders on an Art Deco facade to roofers on a terrace, needs the supply isolated at the network side. In the Eastern Suburbs, where facade repairs, re-roofs and renovations are constant, power disconnection and reconnection is everyday work.
Facade repairs on flats
Art Deco and inter-war blocks in Bondi, Coogee and Randwick regularly need concrete and brick repairs. Scaffold goes up right beside the service line. We plan the isolation with the strata manager, keeping outages short and affecting as few units as possible.
Terrace re-roofs and restorations
Slate and iron roofs in Paddington and Woollahra are being restored. The roofer works around the bracket or raiser. We isolate for those days and replace corroded fittings at reconnection with a point of attachment upgrade.
Renovations
Second storeys, rear additions and all-electric fit-outs change the supply. We fit around the builder’s program.
Demolitions
For rebuilds, the supply is permanently disconnected and the service removed. A temporary builders supply can go in on the same visit.
Attached homes
Terraces and semis share walls. We check how both homes are supplied before isolating.
Switchboard upgrades
We book the same day as your electrician’s switchboard change.
On the day
We isolate at the right point and make sure the supply can’t be re-energised by accident. At reconnection we check fittings and clearances, reconnect, test and certify.
Paperwork
We lodge the Ausgrid notification and give builders written confirmation of the isolation.
Where we work
Isolations are booked across the east, including facade works in level 2 electrician Coogee and Bondi.
Why the main switch isn’t enough
Flicking off the main switch only kills the circuits inside the house. The service line from the pole, the bracket on the wall, the mains running to the meter and the service fuse all stay energised. A roofer resting a ladder against a bracket, or a scaffolder lifting a tube near the wire, is exposed to the full network supply. That’s why Ausgrid requires an accredited Level 2 to isolate before trades work near those parts.
Permanent versus temporary
A temporary isolation is for work that ends with the house reconnected: a re-roof, a facade repair, a new balcony. A permanent disconnection is for demolition, where the service is removed back to the pole or pit and the account closed. Tell us which you need when you book, because the paperwork differs.
Strata timing
In a block of flats, every unit fed through the main supply goes dark when it’s isolated. We help strata managers pick a time with the least impact, usually mid-morning on a weekday, and give a written notice residents can be sent in advance. Where only part of the building is near the scaffold, it’s sometimes possible to isolate just that section.
Covering instead of isolating
On some jobs, the line can stay live with insulated covers fitted at the right points, so residents keep power while trades work at a safe distance. Whether that’s allowed depends on the distances, the type of work and Ausgrid’s rules. We’ll tell you after looking at the site.
Checks at reconnection
Before power goes back on, we inspect the bracket, raiser, conduit and meter box. Near the coast, that’s often when corrosion is spotted. If a fitting is close to failing we tell you on the day, so it can be replaced while the supply is already off.
What builders get from us
A confirmed isolation time, written confirmation for the site file, and a reconnection booked against the program, so the job isn’t held up waiting for power.
Book it
Ring the level 2 electrician Eastern Suburbs team with your dates. If something is unsafe now, call our emergency level 2 electrician number.
Updated
What good power disconnection and reconnection looks like
Power Disconnection and Reconnection across the Eastern Suburbs
Power Disconnection and Reconnection in the Eastern Suburbs: step by step
- Book inDates set with your builder, roofer or scaffolder.
- Notify AusgridNotification lodged first.
- IsolateSupply made dead and safe at the right point.
- Restore or removeReconnected and tested, or removed for demolition.
Power Disconnection and Reconnection guides for Eastern Suburbs homeowners
Power Disconnection and Reconnection questions in the Eastern Suburbs
Something else on your mind? Call 02 9158 9936 and ask.
Our block of flats needs facade repairs. Will all units lose power?
It depends on the scaffold and the line. We plan the isolation to affect as few units as possible.
Do we need the power off for a terrace re-roof?
If the roofer is near the bracket or raiser, yes.
How much notice do you need?
Ideally a week.